We now have siding, some decorative cedar stuff, insulation and drywall. Amazingly, the addition might be finished on schedule by the end of the month.
Here's a very exciting picture of our new air conditioner, which is operating after two days of people working in our attic. For me that meant two days of a very cranky Molly, who had a hard time napping with all the commotion.
This is the office pre-drywall. The French door on the right goes into our bedroom.
1 comment:
It's looking good!
Post a Comment